Solar farm and battery storage, East Hanney
West of the A338, north of East Hanney
Planning permission granted- Land
- 150 acres
- Up to
- 50 MW
- Homes
- 16,700
A 2,800-acre solar farm is proposed across the Vale of White Horse – this is nearly the size of Heathrow. Along with existing solar farms approved or operational in the area, and with Thames Water's reservoir scheme, a lot of local land is being lost. Serious questions have not been answered about the Cearn scheme, and local voices can still change the outcome.
Get involved Our questionsWe are not opposed to solar or renewable energy.
We are opposed to so much land being lost in a relatively small and compact part of Oxfordshire.
Each scheme is judged on its own. We have to live with all of them at once.
Cearn, three more solar farms right next to it and Thames Water's reservoir are all planned within a few miles of each other.
One of the largest solar farm developments proposed in the UK, and nearly the size of Heathrow. It would cover roughly 40% more land than all our local villages combined.
Right beside Cearn: two already have planning permission and one is being considered.
Thames Water's reservoir, which abuts this development: the water, a replacement solar farm and the main buildings, before counting embankments and roads.
Together, at least 5,300 acres: well over one and a half times the size of Heathrow.
The light pink areas are the land inside the planning boundary for Cearn Solar Farm. The darker pink is the White Horse Reservoir scheme, which abuts it. The solid blue areas are the three further solar farms that Cearn's plans do not show. Side by side, they run almost unbroken from Challow to Abingdon.
Swipe sideways to see the whole map, or open it full screen to zoom in.
The scale of this scheme is staggering. A sprawling 12km 'connection corridor' stretches all the way from Kingston Bagpuize - passing through Fyfield, Frilford, Appleton, and Cumnor to the north - while impacting Sparsholt and Childrey in the south, and reaching as far west as Shellingford. Take a look at the maps on the Cearn website to see the full network of affected Parish Councils.
Scroll down the page to see 2 schematic maps (Project location and Our indicative site map) and 1 more detailed overlay on the OS map of the area (Grid connection corridor).
Cearn's indicative masterplan does not show three further solar farms close by: two with planning permission and one under consideration by the Vale of White Horse District Council. Alongside Cearn, they would have a severe cumulative impact on the landscape, environment and ecology of the Vale.
West of the A338, north of East Hanney
Planning permission grantedWest Hanney parish, close to Denchworth
Planning permission grantedNorth-west of Garford, with battery storage
Under considerationThe three smaller farms alone could supply over 46,000 homes. Surely that is already a significant local contribution to the energy network, and to a decarbonised grid by 2035.
We don't want to be drowning in a sea of solar panels.
From the Ridgeway National Trail, Chain Hill and the Uffington White Horse, Cearn would be clearly visible across the open Vale. These views have remained largely unchanged for centuries. Seen from high ground, no hedgerow or planting can screen a development of this scale.
Westminster can't ride roughshod over the White Horse. It needs to look at this cumulative impact.
We don't want to look back and say "I wish I had done something when I could."
Protect the Vale was set up to ask the right questions and to work with neighbouring villages. Now is the time to be heard.
Join usWe are not opposed to solar or renewable energy. We are opposed to so much land being lost in a relatively small and compact part of Oxfordshire.
Cearn, three more solar farms right beside it and Thames Water's reservoir together would take at least 5,300 acres in one compact part of Oxfordshire. Cearn's own plans don't show the three nearby solar farms. Each scheme is judged on its own. We have to live with all of them at once. Westminster can't ride roughshod over the White Horse: it needs to look at this cumulative impact.
Cearn would be a major and irreversible intrusion into some of the most important protected viewpoints in the south of England. From the Ridgeway National Trail, the Chain Hill viewpoint and the Uffington White Horse ancient monument, it would be clearly visible across the open Vale. These places are valued for long, uninterrupted views over a rural landscape that has remained largely unchanged for centuries.
At this scale the impact cannot be screened, softened or mitigated. You can't hide 2,800 acres behind a hedge.
Around 1 million solar panels, mounted on some 250,000 piles driven into the fields. That means a great deal of noise, over around 24 to 48 months of construction.
Around 180 HGV journeys a day on local roads, through 24 to 48 months of construction, on lanes that run through our villages.
150 container-sized batteries, brought in by special convoys. They are not only unsightly in open countryside, they also carry a significant fire risk.
The battery site would place Lyford and Garford close to a continuous industrial noise source: inverter hum, cooling fans and emergency venting. That noise cannot be screened by planting.
Cearn would bring extensive hard infrastructure across the floodplain: piling, cable trenches, access tracks and perimeter fencing. That risks altering natural water pathways, reducing flood storage and increasing groundwater emergence in nearby villages.
The developer is backed by Carlyle, an American private equity firm. We want to know who will own and be accountable for the site over its lifetime.
Updates on Cearn, the reservoir and our campaign, newest first.
Straight answers to the questions we hear most. We update these as the proposal develops.
Have a question we haven't answered? Email us.
Key facts and contacts for journalists covering the Cearn Solar Farm proposal.
Protect the Vale
infoprotectthevale@gmail.com
We can arrange interviews with residents from the affected villages and site visits on request.
| Proposal | Cearn Solar Farm: solar farm with battery energy storage, Vale of White Horse, OxfordshireSource: cearnsolarfarm.co.uk |
|---|---|
| Size | Around 2,800 acres (c. 1,130 hectares)Source: developer announcement; The Oxford Magazine |
| Villages affected | Farmland around Garford, Charney Bassett, Lyford, West Hanney, Goosey and BaulkingSource: The Oxford Magazine |
| Capacity | Grid connection offer of up to 500 MWSource: developer website |
| Developer | Cearn Solar Farm Ltd, a subsidiary of Telis Energy UKSource: developer announcement |
| Backer | Telis Energy was launched in 2022 by Carlyle, the US-listed global investment firm, and is backed by itSource: Carlyle press release, Nov 2022 |
| Planning route | Nationally Significant Infrastructure Project; Development Consent Order decided by the Secretary of State. No application submitted yet.Source: developer website; The Oxford Magazine |
| Solar farm and BESS, north of East Hanney | West of the A338. Planning permission granted. About 150 acres, up to 50 MW, enough for about 16,700 homes.Source: Protect the Vale |
| Manor Solar Farm | Near Denchworth, in West Hanney parish. Consented. About 150 acres, up to 30 MW, enough for up to 11,132 homes in its first year.Source: Renewable Connections; acreage from Protect the Vale |
| Willowfields Energy Park | South-east of Kingston Bagpuize and north-west of Garford. Solar with battery storage (49.9 MW solar, 20 MW battery). Application P24/V2698/FUL submitted to Vale of White Horse District Council, validated January 2025. Likely to need about 300 acres; enough for about 18,500 homes.Source: Exagen; acreage and homes from Protect the Vale |
| Solar around Cearn, combined | About 3,400 acres: Cearn 2,800 acres plus the three farms above (about 600 acres). The three smaller farms would supply over 46,000 homes. |
| Cearn compared with other UK solar schemes | At about 2,800 acres (c. 1,130 ha), Cearn is among the largest solar developments proposed in the UK. For comparison, Tillbridge Solar in Lincolnshire, approved in 2025 as the UK's largest, covers about 1,400 ha.Source: pv magazine, Oct 2025 |
| Cearn compared with local villages | Roughly 40% more land than the footprint of all the local settlements combined.Source: Protect the Vale |
| Heathrow Airport | 1,227 hectares (c. 3,030 acres) within the airfield boundarySource: Heathrow Airport company FAQs |
| White Horse Reservoir: land we count | At least 784 hectares (c. 1,940 acres), made up of: the water surface, about 6.7 km² (670 ha); a replacement solar farm on 100 ha to the west of the reservoir, replacing three existing solar farms (69.5 MW) the reservoir would remove; the pumping station compound, around 52,000 m² (5.2 ha); two recreational lakes of 3 ha and 5.5 ha.Source: Thames Water, Statutory Consultation Brochure, Autumn 2025 |
| Not yet counted | Embankments 15–27 m high with a base around 400 m wide, a 3 km access road, a 5 km road diversion, a water treatment works, car parks for around 750 cars, and visitor buildings. Thames Water has not published land areas for these, so they are left out of our total.Sources: Thames Water brochure; Thames Water, PEI Report Non-Technical Summary, Oct 2025 |
| White Horse Reservoir: full site boundary | Around 38 km² (c. 3,800 ha). Thames Water's draft Order limits cover all land potentially needed, including temporary construction land and land for landscaping and new habitats. A review more than tripled the site to make room for extra building works, relocated solar farms and rerouted rivers.Sources: The Guardian, 14 Sept 2026; CPRE Oxfordshire; Thames Water PEI Non-Technical Summary (section 2.3) |
| White Horse Reservoir: water | Water surface about 6.7 km² (670 hectares; c. 1,650 acres), holding 150 billion litresSources: Vale of White Horse District Council; Thames Water brochure |
| Reservoir timetable | Pre-application. Thames Water opened a further targeted consultation on land changes in September 2026 and aims to apply by late 2026.Sources: Planning Inspectorate; The Guardian |
Protect the Vale is a residents' group formed in response to the proposed Cearn Solar Farm in the Vale of White Horse, Oxfordshire. It is not opposed to solar or renewable energy, but to the loss of so much land in a relatively small and compact part of the county. It works with neighbouring villages to ask the questions that must be answered before any decision is made.
Protect the Vale is not affiliated with any developer or political party.
The earlier we act, the more we can shape what happens. Here's how you can help.
Hear first about consultation dates, public meetings and deadlines.
Last updated: November 2026
Welcome to Protect the Vale (https://protect-the-vale.org.uk/). By accessing our website, subscribing to our updates, or participating in our campaign, you agree to comply with and be bound by the following terms and privacy practices. Please read them carefully.
Protect the Vale is a local residents' campaign group. Our website is provided free of charge to share information, coordinate campaign efforts, and keep local communities informed.
When using our website, you agree not to:
The content on our website is provided for general informational and campaigning purposes only. While we endeavor to keep information accurate and up to date, we make no representations or warranties of any kind (express or implied) about the completeness, accuracy, reliability, or availability of the website. Protect the Vale accepts no liability for any loss or damage arising from the use of this website.
Protect the Vale is committed to protecting and respecting your privacy. We process personal information lawfully and transparently in accordance with the UK General Data Protection Regulation (UK GDPR), the Data Protection Act 2018, and the Data (Use and Access) Act 2025.
We collect personal information directly from you when you enter your details on our site (such as when subscribing to updates or getting in touch). This may include:
We will never collect sensitive ("special category") personal data about you without your explicit consent.
Your information is used exclusively by the Protect the Vale residents' campaign for the following purposes:
We will never sell, rent, or trade your personal information with third parties for marketing purposes.
We may use cookies or similar technologies to monitor site usage and understand which areas of the website are visited most often, in compliance with applicable UK data and privacy frameworks. A cookie is a small data file stored on your device's hard drive that does not contain your personal information. You can modify your browser settings to refuse cookies; you will still be able to use our website.
Under UK data protection law (including the UK GDPR and the Data (Use and Access) Act 2025), you have rights including:
We may update this policy from time to time to reflect evolving legal standards. If you have any questions, comments, or wish to exercise your data rights, please contact us at:
If you are unhappy with how we handle your data, you have the right to lodge a complaint with the UK data protection regulator, the Information Commissioner's Office (ICO): https://ico.org.uk/.